Chassis & mast assembly thoroughly
steam cleaned |
 |
Hydraulic system checked and repaired
as necessary |
 |
Electronic panels inspected, with
contact tips replaced as required |
 |
Motors inspected, brushes replaced
as necessary |
 |
Full service carried out, to include
forks & chain inspection & thorough examination as required
under Health & Safety Legislation |
 |
Brake operation checked and repaired
as necessary |
 |
Tyres re-cut or service tyres fitted |
 |
Machine load tested to rated capacity |
 |
Machine re-sprayed and new decals
fitted |
 |
Final independent quality inspection
carried out |
 |
Machine thoroughly inspected |
 |
Chassis totally cleaned and all damage
repaired |
 |
Brake system stripped and components
replaced as required |
 |
Oil pressure relating to all major
components, i.e. engine, hydraulics and driveline are checked.
These will be adjusted and, where required, brought within tolerance |
 |
All motors removed and electronically
tested and overhauled, including brushes, bearings and commutator
cleaned |
 |
Electronic control panel removed,
inspected & cleaned with wiring and components replaced
as necessary |
 |
Mast assembly will be stripped and
re-shimmed, with rollers replaced as required |
 |
New seat and seat restraint fitted |
 |
New lift chains fitted |
 |
New tyres fitted |
 |
New forks fitted |
 |
Full service carried out, to include
thorough examination, as required under Health & Safety
Legislation |
 |
Machine load tested to rated capacity |
 |
Machine will undergo full re-spray
including 2 undercoats and topcoats as necessary |
 |
New decals fitted |
 |
Final independent quality inspection
carried out |